Horonda industrial platform concept aerial

Horonda

A Ukraine-EU infrastructure platform for logistics, industry, and energy.

A Ukraine-EU infrastructure platform for logistics, industry, and energy.

Transcarpathia, Ukraine: logistics access, industrial land, and energy infrastructure planned as one operating site.
Why Horonda
13.8 haTerminal land with rail access, Ready-to-Build (RTB)
35 haIndustrial park development area
25 MWOn-site dedicated power plant
29 kmTo EU borders: three countries within reach
€100M+Total CAPEX across all three sectors

One site. Three systems. One loop.

Horonda is structured as one operating perimeter: terminal access brings flows, the park turns flows into resident demand, and the energy core lowers operating risk. The value is in the interface between the three layers, not in any single parcel.

01 / Port · gateway

Goods move by rail where road capacity becomes a bottleneck. A dual-gauge terminal gives the site a practical Ukraine-EU interface.

02 / Park · demand

Land is planned around industrial use, not only ownership. Build-to-suit plots connect logistics, utilities and resident operations inside one perimeter.

03 / Energy · resilience

Energy risk is designed into the site. A captive utility layer can support power, heat and cooling as resident demand comes online.

At Ukraine's western logistics edge.

Horonda sits in Transcarpathia, where Ukraine-facing and EU-facing logistics, industrial land, and resilient energy needs meet. The site is built for cross-border operations, manufacturing relocation, and reconstruction-related flows.

Border operating base

Safe operating environment in Transcarpathia. Horonda sits at Ukraine's western EU border, in one of the country's safest operating regions.

Public corridor view

Corridor logic, without overclaiming geography. The public route board is deliberately simplified: Horonda combines border access, Central European demand and Adriatic optionality. Detailed assumptions sit in investor materials.

Horonda rail corridor map: a continuous route from Spain through Trieste on the Adriatic to Horonda in western Ukraine, with branches to Germany, south through the Balkans to Thessaloniki, and through Romania to Turkey

One site, three core layers.

The site logic is simple: logistics creates access, the park converts access into resident demand, and energy improves operating resilience. The investable core is industrial first; workforce and community context support the operating perimeter.

Three project routes, one site logic.

Start with the layer you are evaluating: logistics access, industrial resident demand, or energy resilience. Each route leads back to the same site-level investment case.

Layer 01 / Gateway

Horonda Port

A dual-gauge intermodal gateway at the European-Ukrainian rail interface. Port gives the site its first operating layer: movement, customs logic, and cross-border logistics demand.

13.8 haDry port
130k TEUCapacity concept
Dual gauge1520 / 1435 mm
Open Port route
creates access → converts into demand → lowers operating risk
Layer 02 / Demand

Horonda Park

An industrial development area for manufacturing, warehousing, light industry, and build-to-suit residents. Park turns logistics access into committed demand and long-term land value.

35 haPark land
BTSResident logic
QualifiedPipeline review
Open Park route
Layer 03 / Resilience

Horonda Energy

A resilience layer planned around CHP+BESS infrastructure and future resident loads. Energy improves site control through dedicated utilities and a qualified project economics track.

25 MWBase-case concept
CHP+BESSPlanning logic
QualifiedEnergy review
Open Energy route

Prepared for qualified investor due diligence.

Detailed techno-economic calculations and financial models are available through qualified review, not published as open marketing material. Authorized investors and strategic partners can access the site specification, logistics calculations, financial model and legal structure through a controlled review track.

Site

Port and industrial park land are planned as one operating perimeter.

Logistics

Rail-side logistics and border-interface logic define the terminal layer.

Finance

Detailed financial models are available through qualified investor review.

Governance

Support mechanisms and eligibility require legal confirmation before public claims.

Developed by NSV Group.

NSV Group leads the development of Horonda within a single coordination track. The group pairs years of delivering large-scale engineering and infrastructure projects (since 2007) with hands-on expertise in managing investment assets. Its own expertise spans transport logistics, customs brokerage and export support, and the project is delivered in partnership with recognized market leaders in engineering, law and logistics.

Engineering A delivery record on large engineering and infrastructure projects.
Investment Hands-on investing across multiple sectors and project types.
Logistics & export Own experience in logistics, brokerage and export support.
Market partners Executed with Tier-1 partners in logistics, engineering and law.

Your strategic entry into Ukraine's recovery economy.

Tell us which layer you are evaluating: terminal operations, resident demand, energy infrastructure, or the full site case. Qualified inquiries receive the relevant materials, investor pack, or a direct conversation with the founder.

Integrated infrastructure platform for logistics, industrial residents, and energy resilience.
Your details are used only to assess and respond to your inquiry.